Province | Subbasin | % |
---|---|---|
Columbia Plateau | Yakima | 100.00% |
Previous: | Next: |
---|---|
56662 REL 53: 2008-465-00 EXP YN COHO HATCHERY PROGRAM-HOLMES STEP 2/3 |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | A: 119. Routine and specific administrative tasks | 12/31/2016 | 12/31/2016 | |
Provide input on EC activities to produce a draft EIS | B: 165. Assist BPA EC lead with NEPA/ESA | 12/31/2016 | 12/31/2016 | |
Support and coordination of Step 2 and 3 | C: 196. Input to Steps 2/3 review and approval | 07/31/2018 | 09/30/2018 | |
Provide technical review through final design | D: 122. Input into design development | 12/31/2018 | 05/31/2018 | |
Refined M&E Plan that meets Step 2 requirements | E: 174. Develop a refined monitoring and evaluation plan for Step 2 | 12/31/2018 | 12/31/2018 | |
Refined HGMP for submittal to NOAA Fisheries | F: 174. Refine draft HGMP and respond to NOAA comments | 12/31/2016 | 12/31/2016 | |
Water permits | G: 98. Obtain 2 non consumptive water rights for Holmes Ranch coho facility | 02/28/2018 | 04/30/2018 |
Primary Focal Species | Work Statement Elements |
---|---|
Coho (O. kisutch) - Unspecified Population |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Routine and specific administrative tasks | 01/01/2016 | ||||||
B | 165 | Assist BPA EC lead with NEPA/ESA | 01/01/2016 | ||||||
C | 196 | Input to Steps 2/3 review and approval | |||||||
D | 122 | Input into design development | 01/01/2016 | ||||||
E | 174 | Develop a refined monitoring and evaluation plan for Step 2 | 11/12/2015 | ||||||
F | 174 | Refine draft HGMP and respond to NOAA comments | 11/12/2015 | ||||||
G | 98 | Obtain 2 non consumptive water rights for Holmes Ranch coho facility | 11/12/2015 | ||||||
H | 185 | Periodic Status Reports for BPA | 01/01/2016 | ||||||
I | 132 | A progress report is not needed | 01/01/2016 |